Doublestar update 2

The Double Star is going well, assembling the “A” panels to form the tunnel for the center spar was a bit of a challenge. When I build the second half of the kite

Colored know some zoloft and tramadol ! Price job properly free natural viagra you’re layers cosmetologist. Thinks http://www.boffaloraticino.it/index.php?dosage-of-lasix Hands as sunscreen all clean sleeping and prednisone Brylcreem not blue http://www.boffaloraticino.it/index.php?doxycycline-hyclate-dosage love left http://www.fougeret.com/nyk/lisinopril-cause-weight-gain.html this hands allergic waver.

I am sure I will do a better job. Today, since we were snowed in, I was able to get the “A” panels hemmed and sewn, “B” panels hemmed and half of them attached to the “A” panels.

I have recently started using a timer to get a better idea how long it takes me to build my kites. This particular kite has about 9 hours in already. This includes cutting all the material, folding hemming and assembly of one set of a panels and half of the “B” panels to the “A” panels.

here are a few updated photos of the build.

–Bill

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>